Features-Vermeer PD10 post rammer / post driver / pile driver -Purchased new in 2018 -Only 398 post driving hours (1205 engine hours) -49hp/ 36.4KW diesel engine -Emergency stop button -Fire extinguisher -Rollover protection system (ROPS) -Key Technology: Standard auto-plumb for vertical accuracy, optional GPS integration -Hammer: High-frequency with 1500 bpm maximum impact -Pile Capacity: Handles up to 9.3-inch (23.6 cm) round or 9.3-inch (23.6 cm) square piles (with large opening)
Equipment Details
Maximize your production speeds and precision placement on commercial solar farm installations, highway fencing, and civil engineering projects with this exceptionally clean 2018 Vermeer PD10 tracked pile driver. Purchased brand new in 2018, this unit has been highly optimized and shows just 398 genuine post-driving hours (with 1,205 total engine idling and transport hours). The PD10 is the unchallenged industry benchmark for utility-scale solar contractors, engineered specifically to handle continuous, high-cycle structural pile placement while minimizing labor overhead and ground disturbance. Driven by a dependable 49 HP diesel engine, this rubber-tracked crawler is designed to traverse uneven, muddy jobsite terrains seamlessly. Equipped with Vermeer?s automated alignment technology and a high-impact hammer, this machine dramatically cuts down tracking time, allowing your crew to move swiftly from point to point with millimeter accuracy.
Key Technical Specifications: Model Year: 2018
Hours: 398 Driving Hours / 1,205 Total Engine Hours (Very low actual hammer engagement time).
Serial Number: DWL2015
Engine: 49 HP (36.4 kW) Turbo Diesel Engine (Provides the ideal combination of low fuel consumption and sustained hydraulic pressure for rapid mast transitions).
Undercarriage: Heavy-duty rubber tracks designed for low ground pressure, preventing site ruts and allowing operation across sensitive grades or established solar fields.
High-Frequency Impact Hammer & Mast Capacity: Hammer Performance: Equipped with a premium, high-frequency hydraulic impact hammer delivering up to a massive 1,500 blows per minute (BPM). This rapid cycle time allows it to smoothly drive steel I-beams, C-channels, or heavy timber piles into tough, highly compacted shale or hardpan clay.
Structural Capacity: Configured with a wide-opening pile guide capable of managing up to 9.3-inch (23.6 cm) round or 9.3-inch (23.6 cm) square piles. This extra-large clearance accommodates robust heavy-gauge structural columns smoothly.
Intelligent Machine Precision & Safety Systems: Standard Auto-Plumb: Features Vermeer?s integrated Auto-Plumb technology.
Note: At the push of a button, the hydraulic system automatically corrects and adjusts the mast angle to ensure the pile is driven perfectly vertical, eliminating the manual guesswork of spirit levels and drastically reducing cycle time per post.
GPS Integration Ready: Engineered with factory hardware provisions allowing for simple, seamless GPS guidance integration to navigate automatically to exact engineering survey coordinates.
Site Safety Features: Fully equipped with a structural Rollover Protection System (ROPS) bar framework, an easily accessible dual-side Emergency Stop (E-stop) button, and a mounted fire extinguisher to meet strict commercial tier-one jobsite safety requirements.
? Dealer Note: The Vermeer PD10 is the ultimate asset for solar installation crews because it combines raw mechanical hammering speed with highly automated alignment intelligence. Finding a single-owner, low-driving-hour 2018 model in this clean condition presents an excellent opportunity to expand your fleet's output without waiting on long factory assembly lead times. This unit has been fully shop-inspected, mast-slide tolerance checked, and hydraulic pressure-tested. It is 100% turn-key and ready to start driving piles for your operation today!
How Equipment Moves From Bid to Release
Create a buyer account Register with your email or use Google sign-in so the machine can be tied to your profile.
Verify before action The first bid or purchase action sends you to ID verification before the order can be completed.
Bid or buy the machine After verification, you can compete on the timer or buy the machine immediately at the displayed fixed price.
Manage the order file Won and purchased machines appear in My Orders, where contracts, invoices and payment proof are handled.
Sign the sale agreement Each order requires signed sale paperwork. You may sign online in My Orders or email a signed copy.
Receive your invoice Once the agreement is completed, the invoice is added to My Orders and sent via email.
Pay by bank transfer Payments are completed by bank transfer using the details provided on the invoice.
Upload proof of payment After sending the transfer, upload payment confirmation in My Orders to help speed processing.
Payment confirmation and release Once funds are received, we prepare release instructions and shipping coordination for the machine.
Helpful Notes
Ensure your ID upload is clear to avoid verification delays.
Uploading payment proof immediately can shorten processing time.
All order actions stay centralized in the My Orders section.
Place a bid
By clicking Submit bid, you agree to complete the purchase if you are the winning bidder.
Live bid
$29,730
Your bid
Confirm Purchase
By clicking Commit to Buy, you agree to purchase this machine at the displayed fixed price. Order terms, eligibility and coverage are governed by the signed sale agreement.